Full design, Pallet Racking & industrial shelving

Customer – Distributor of Raw Foods Location: Southglade Food Park, Gala Way, Nottingham Design Brief – We were approached by our client who was requesting a full turnkey storage solution for his new unit in Nottingham. Over the last few years they have been growing at a dramatic rate which meant that they had to find more…

Continue reading

Pallet Racking & Industrial Shelving

Customer – Scientific Supplies Company Location: Scudamore Road, Leicester, Leicestershire Design Brief – A rapidly growing scientific supplies company turned to the warehouse storage solution specialists T2 Storage Solutions to provide a suitable pallet racking & shelving design to improve their current storage space within their Leicester based warehouse. After the initial site consultation, detailed…

Continue reading

Pallet Racking – Distribution Centre – Sandiacre

Customer– Sales & Distribution of Hose & Fluid Connectors Location: Sandiacre, Nottinghamshire Design Brief – A rapidly growing global company (in 17 countries with 175 branches) with their UK Headquarters in Nottingham approached T2 storage Solutions to help them design, plan & install a suitable storage solution for their new warehouse & distribution centre in…

Continue reading

LOCAL AUTHORITY HOUSING ORGANISATION – STORAGE USE MEZZANINE FLOOR

LOCATION: Mansfield, Nottinghamshire T2 Storage Solutions were contacted by a local authority as they were desperately short of industrial storage space. Our solution came in the form of a bespoke fabricated mezzanine floor of which we discussed their exacting requirements in great detail before submitting our detailed quotation and competitive quotation for our client’s approval.…

Continue reading

Leading International Aerospace Company

Installation – September 2014 Location – South of England T2 Storage Solutions recently won a prestigious contract for an international aerospace company to design & install suitable heavy duty cantilever & adjustable pallet racking systems allowing them to store bulky & awkwardly shaped parts that did not fit into conventional pallet racking. This meant that…

Continue reading

Secure Drug Storagewall – NHS Clinic (Birmingham)

Customer – NHS Location – Whittall Street, Birmingham A busy office within a NHS clinic on Whittall Street in Birmingham needed a secure storage solution to store medical drugs for the following reasons:- Reduce / Prevent theft, loss or pilferage Prevent infestations from vermin or pests Avoid deteriation or contamination Avoid disfiguration of label Keep…

Continue reading

Skin Care Manufacturer

Location – Derby, Derbyshire. T2 conducted an in depth review & pallet racking survey at our customers state of the art manufacturing facility in Derby to ascertain whether their existing pallet racking installation was suitable for their current needs. It was quickly apparent that the previous racking design was simply wrong for their new requirements…

Continue reading

Recruitment Company – Office Fit Out Works

Location – Worksop, Nottinghamshire An expanding recruitment company needed a larger head office and were looking for a suitable contractor to “Fit Out” their new offices in Worksop. After the initial consultation T2 (Nottingham) presented our customer with a comprehensive quotation and CAD (Computer Aided Design) drawings to show the proposed layout and how their corporate…

Continue reading

Artificial Sports Surfacing Supplier – Pallet Racking Installation

Location – Whetstone, Leicestershire Due to the success of a sports surfacing company, it was clear they needed more warehouse space and a suitable racking solution to meet their requirements. After a consultation with racking experts T2 Storage Solutions we came up with the following racking specification. Stow Pallet Racking – 4.5m high x 3.3m wide x…

Continue reading

Game Manufacturer – Large Mezzanine Floor Project

Location – Lenton, Nottingham, Nottinghamshire Large Mezzanine Floor (1,600m2) to form a new storage / working platform. This was a particularly tricky installation as the mezzanine floor had to be installed over an existing conveyor and carton live storage system without compromising our customers 24 hour operation. This was a complex, well planned multi product…

Continue reading