Mezzanine Floor, Office, Meeting & Test Room Fit Out
Leigh On Sea – Essex
CI.Connect, a prominent supplier of video and audio solutions in the UK, approached T2 Storage Solutions with a vision to expand their operational space. Their goal was to create a multifunctional environment that could accommodate office operations, testing facilities, and storage for electronic goods within their newly acquired warehouse premises.
Mezzanine Floor and Office Fit Out
To accomplish this goal, we designed a mezzanine floor with a floor hight of 3.45m and a live load of 5kN/m2, providing ample space and structural integrity to meet CI.Connect’s expanding business requirements. The project required meticulous planning to ensure optimal utilisation of space while adhering to strict safety regulations and industry standards.
To create the desired work space, solid partitions were installed to define areas such as the main office, testing area and breakout space. Double glazed window partitions were incorporated to provide visibility to the testing area while maintaining acoustic insulation. Double-boarded partitions were utilised to reduce noise transmission between rooms, promoting a productive work environment.
To ensure safety on the mezzanine level, safety edge protection in the form of hand and knee rails were supplied and installed alongside a safety pallet gate for loading and unloading goods. Additionally, ceiling quilt bags were utilised for insulation to maintain optimal temperature levels.
The successful completion of the project resulted in a transformed workspace for CI.Connect, providing them with additional office space and amenities to support their growing business operations.
Works Included:
- Full Design & Turnkey Project Management
- 119m² Mezzanine Floor Design and Install
- 1 Hour Fire Protection to Mezzanine
- AC and Fresh Air Ventilation
- Office Flooring and Decoration Works
- New Steel Staircase
- Edge Protection and Safety Pallet Gate
- Double Bordered and Double Glazed Partitions
- Teapoint Plumbing including Hot Tap
- New Warehouse and Office LED Lighting
- Extension of Fire Alarm System
- Suspended Ceiling Quilt Insulation